Arts and Industries Building – Washington, D.C. ($5.2 million)
- masonry repointing of failed joints to stop the ingress of water
- hazardous material removal and selective demolition
National Zoological Park ($10.1 million)
- fire protection projects at Rock Creek campus (Washington, D.C.) and Conservation Research Center (Front Royal, Virginia)
- replace roofs at Rock Creek campus and Conservation Research Center
- replace deteriorated animal-holding facilities at Conservation Research Center
- repair bridges at Rock Creek campus
Other Smithsonian Projects ($9.7 million)
- install high-voltage electrical safety improvements at multiple locations on the National Mall (Washington, D.C.)
- install sewage backflow preventers on potable water lines at multiple locations off the National Mall; biggest project is at Museum Support Center (Suitland, Maryland)
- install emergency generators at the Smithsonian Environmental Research Center (Edgewater, Maryland)
- refurbish or replace elevators and escalators at the National Air and Space Museum and National Museum of American History (Washington, D.C.)
-
temporary/contract support – approximately 4 personnel
For more information about the Recovery Act: 